OUTBUILDINGS and boundary walls at a structure damaged when a sinkhole opened on Rouge Bouillon are being demolished. The government confirmed that structural engineers had signed of the work with a geological survey expected to begin this week once debris is removed. Rouge Bouillon between Clarendon Road and Palmyra Road had to close after the

OUTBUILDINGS and boundary walls at a structure damaged when a sinkhole opened on Rouge Bouillon are being demolished. The government confirmed that structural engineers had signed of the work with a geological survey expected to begin this week once debris is removed. Rouge Bouillon between Clarendon Road and Palmyra Road had to close after the […]