We are currently exploring a new look and feel for FIXEDD — thank you for your patience!
Sun. Apr 13th, 2025

McLaren confirms subcontractor team on £135m warehouse job

Work starts on TN2 Gateway site in Kent.  

McLaren has confirmed its subcontractor team on a job for Scannell Properties and Royal London Asset Management Property to build the £135m TN2 Gateway warehouse and industrial site at Tunbridge Wells, Kent.

Work got underway earlier this month at the site which will deliver 505,000 sq ft of warehousing accommodation with ancillary office space on a 33-acre site.

Six flexible buildings can be configured as up to nine units, ranging from 23,000 to 175,000 sq ft.

McLaren Construction’s managing director for industrial and logistics, David Gavin, said: “This will be a stunning setting for an industrial park, with a generous planting scheme that blends sympathetically with the surrounding area.

“Creating the on-site part of that landscape is one of the most complex parts of the project. It’s more important than ever to draw on our environmental management experts to minimise the impact of construction.”

The first buildings are due to be ready for occupation in 2026.

 

McLaren’s subcontractor team includes:

 

  • Steelwork: B&K Structures
  • Wall and roof cladding: CA Group
  • Whitewall: Cold Clad
  • Pre-cast warehouses: Modular Cubed
  • CMC piling: Keller
  • Curtain walling/glazing: Ridgeway Facades
  • Photovoltaics: Watt Energy
  • Passenger lifts: Kone
  • Siphonic drainage: Sapaflow
  • M&E: UME
  • Dock levellers and doors: Promstahl

Read More

About The Author

By FIXEDD

FIXEDD began as a personal website with a focus on construction topics. As it evolves, FIXEDD aims to become a valuable resource for AEC professionals, providing current industry news, software updates, and expert advice. With a vision to grow and make an impact.

Related Post

Leave a Reply

Your email address will not be published. Required fields are marked *