Skanska wins $40m contract to overhaul Boston airport garage

Skanska has won a $40m contract from the Massachusetts Port Authority to renovate the 250,000-sq-ft Terminal B Garage at Boston Logan International Airport.

The aim is to improve the flow of traffic, drainage, and lighting.

The garage will keep operating during the work.

Level 1 of the garage will have dedicated travel lanes and pickup zones. Taxi and shuttle stands will be moved to the curbsides.

On Level 2, Skanska will fix roadways and move the limousine pool.

Other work includes structural repairs, lighting upgrades, MEP/FP systems relocation, and improving stormwater drainage.

Work starts this summer, and is expected to finish by the end of 2026.

The post Skanska wins $40m contract to overhaul Boston airport garage appeared first on Global Construction Review.

By

Related Post

Leave a Reply

Your email address will not be published. Required fields are marked *

error

"Stay ahead with the latest in AEC news at FIXEDD! We're building a go-to resource for industry pros. Enjoy our insights? Share with colleagues in architecture, engineering and construction and help us grow! 🌍"