Transport minister signals HS2 will run to Euston

The Government has dropped its biggest hint yet that it will fund the HS2 line to Euston as originally planned.

Transport secretary Louise Haigh signalled she was minded to drop the previous Government’s money-saving plan that will see the line stop at Old Oak Common in North London pending a privately funded solution being found for the final tunnel drive and Euston HS2 Terminus build.

In an interview with Times Radio, the Transport Secretary today said “Look we’ve said before Euston was always planned to be part of the picture for HS2 and we’re hoping to make an announcement on that very soon.”

Commenting on funding for the tunnel and Euston terminus, Haigh said: “We’ll be making an announcement on that soon but it certainly doesn’t make, it would never have made sense to leave it between Old Oak Common and Birmingham.”

The final HS2 5.4-mile tunnel drive to Euston from Old Oak common is expected to cost around £1bn.

Over the last few months, Skanska Costain Strabag JV has continued with preparation works to launch the two final TBMs from the Old Oak Common Box towards Euston, despite uncertainty about the Euston terminus plan.

The cost of HS2’s revised London Euston terminus has almost doubled to £4.8bn since 2020, despite efforts to redesign and scale down the number of platforms to six.

By

Related Post

Leave a Reply

Your email address will not be published. Required fields are marked *

error

"Stay ahead with the latest in AEC news at FIXEDD! We're building a go-to resource for industry pros. Enjoy our insights? Share with colleagues in architecture, engineering and construction and help us grow! 🌍"